F&V Adds Another MDOT Prequalification

Fleis & VandenBrink (F&V) has been approved for the ‘Design – Traffic: Safety Studies’ prequalification. This allows us to evaluate the safety performance and operations of roadways.

MDOT requires a safety analysis on all 3R (resurfacing, restoration and rehabilitation), 4R (new construction / reconstruction) and some CPM (capital preventive maintenance) projects.

F&V is now prequalified in over 30 categories.

Give us a call to evaluate your road’s safety performance so you can travel safely whenever you’re heading.

Share on facebook
Share on twitter
Share on linkedin