Industrial Stormwater Management

Assisting Facilities in Stormwater Compliance

Industrial facilities in Michigan that have the potential to negatively impact stormwater quality are required to have an Industrial Stormwater permit. The permit requires facilities to develop a Stormwater Pollution Prevention Plan (SWPPP) and have a certified industrial stormwater operator.

F&V assists companies in determining if a stormwater permit is required.  We also provide certified operators who supervise and inspect the stormwater treatment and control measures including doing visual assessments and collecting and evaluating samples.

In addition, F&V can develop plans for Pollution Incident Prevention (PIP) sand Spill Prevention Counter Control (SPCC), if needed. The plans can be standalone documents or incorporated into the SWPPP.

F&V’s stormwater management services include:

  • Assisting permit process
  • Drafting/Revising SWPPPs
  • Providing certified operators
  • Conducting visual assessments/sampling