Water Supply Pipeline
Project Highlights
- 13-mile transmission main design and construction observation for KWA pipeline
- Resident engineering services on additional 15-mile segment
- Part of 65-mile regional pipeline with pump stations and Lake Huron intake
- New supply delivering up to 86 MGD from Lake Huron
- Largest Genesee County construction project in 50 years
- Regional collaboration to establish independent water source and long-term cost savings
Project Summary
In an effort to save local residents millions of dollars in future water bills, the Genesee County drain commission, along with commissions of Lapeer and Sanilac counties, and the cities of Flint and Lapeer, formed the Karegnondi Water Authority (KWA) in 2010. The KWA decided to build a pipeline to Lake Huron instead of relying on the city of Detroit for its water supply.
Fleis & VandenBrink was hired for surveying, designing and construction observation of transmission mains on a 13-mile portion of the 65-mile pipeline project that also included pump stations and lake intake. Fleis & VandenBrink is also providing resident engineering services on a separate 15-mile section of the project.
Construction is expected to finish in 2016. The project is the largest construction project in Genesee County in the last 50 years and sees the KWA control their own supply. The new pipeline, which will draw 86 million gallons of water a day from Lake Huron, is expected to save KWA residents $3 to $5 million during the first year the pipeline is in use — and every year after.
Tell Us About Your Project
Start a conversation with our design team. We’ll help you turn your vision into a buildable, fundable project.

