Traffic Engineering
Road Resurfacing and Traffic Calming
Infrastructure is a high priority for the City of Royal Oak. Rochester Road, a major thoroughfare that averages 16,000 vehicles per day, was identified as a roadway needing improvements. The…
Read More Downtown Road and Signal Improvements
F&V provided overall management in design and construction administration for downtown road and signal improvements.
Read More Road Study
F&V led a feasibility study on a road study, including crash analysis, calculation of intersection delays, & vehicle cues.
Read More Traffic Signal Designs
F&V worked with City of Royal Oak to identify and redesign four prominent corridors, covering more than 10 miles and 36 traffic signals.
Read More Corridor Study and Improvements
F&V provided a corridor study to solicit public input, evaluate options for design elements, & provide design of the corridor improvements.
Read More Traffic Impact Study for Redevelopment
F&V provided a traffic impact study for redevelopment on how the proposed developments would affect traffic.
Read More Traffic and Pedestrian Signals
F&V helped provide design and construction engineering for the new traffic and pedestrian signals and sidewalk ramp upgrades.
Read More